Meet the project team

Drop into one of our information sessions to find out more about the proposed design, how we got here, and how you can make a submission on the project.

  • Saturday 25 July, 11am-2pm: Brooklyn Community Centre, 18 Harrison Street, Brooklyn. 
  • Tuesday 28 July, 5pm-7pm: Two Todman, 2 Todman Street, Brooklyn. 

 
To get printed copies of information or a feedback form, email citydesignprojects@wcc.govt.nz or call 04 499 4444. 

2026 Consultation supporting docs

The Plans

View the full set of plans for the proposed changes

260619 Brooklyn TR Plans Final (2) (8.1 MB pdf)

Traffic Resolution TR67-26

This document describes in detail the proposed changes and controls to the streets

260526 1003220 Brooklyn TR 2026 Rev A (3.1 MB pdf)

Hybrid Design Brooklyn Connections

This report assesses the costs and benefits of the proposed permanent Brooklyn Hill Cycleway hybrid design, including its impacts on safety, health, transport and access.

Brooklyn Hill Cycleway Economics Final Report v2 20251202 (1) (908 KB pdf)

2026 Design-Safe Systems Audit (SSA)

This document is an independent safe systems audit of the 2026 Brooklyn Connections designs

310206429 Brooklyn Hill Amended 90 Design SSA 260626 Designer Response Signed Off (1.2 MB pdf)

Pedestrian Crossing Memo

This report presents the findings of Egis NZ’s assessment of the potential pedestrian crossing locations on Ohiro Road

BIL 1003220 Ped Crossing Memo (1) (3.8 MB pdf)

Kōrero mai
Have your say

If you have explored the proposed plans and want to share your ideas, our online form takes 3–5 minutes to complete and requires no registration. You can share your thoughts on the proposals, add detailed comments, and upload relevant documents or photos. Consultation closes on 3 August 2026.

If you need help with making a submission, please email us at citydesignprojects@wcc.govt.nz or visit a drop in session.

2025 Brooklyn Connections design

2025 Design - construction plans

This document shows the 2025 design of the new road layout for the Brooklyn Road and Ohiro Road. 

2025 Brooklyn connections IFC designs (28 MB pdf)

2025 Design - Safe Systems Audit

This document is an independent safe systems audit of the 2025 Brooklyn Connections designs

2025 Brooklyn connection Safety System Audit 90% Detailed Design (3.6 MB pdf)

2023 Brooklyn connections consultation

The plans

Full set of plans for the 2023 proposed changes

Brooklyn to City Raised Uphill Bike Lane GA Optimized (13 MB pdf)

Traffic Resolution TR105-23

This document describes in detail the 2023 proposed changes and controls to the streets.

TR105 23 Brooklyn Hill Permanent Improvements (6.1 MB pdf)

Consultation summary

This document summaries feedback received from the community about the project during the original consultation period (27 June to 23 July 2023). This report was presented to Council, along with all submissions in full when they made the decision.

BrooklynConnections EngagementSummaryReport 8Aug23 (3.5 MB pdf)

Parking management plan

This report shows how the parking in the area would have been managed

Brooklyn to City Improvements Parking Management Plan Final with Appendices 02.02.23 (6 MB pdf)

Multi-criteria analysis - Long list options

The memo outlines analysis of the long list of options considered to move into the short list of options for the 2023 design

20220516 LongListMCASummaryMemo Jacobs (406 KB pdf)

Multi-criteria analysis - Short list of options

The memo outlines analysis of the short list of options for the 2023 design

20220805 ShortListMCASummaryMemo Jacobs (1.7 MB pdf)