Stage 2: Greta Point to Cobham Drive
Final plans for construction
These detailed design plans show how the section of Evans Bay Parade from Greta Point to Cobham Drive will change. They include changes that were made to the draft plans in response to community feedback following consultation in 2021.
Amended - Concept Designs
AMENDED Concept Designs in Full (4.9 MB pdf)Amended - Parking management plan
AMENDED Parking Management Plan 9.11.21 (13 MB pdf)Amended - Supplementary design report
AMENDED Supplementary Design Report Evans Bay Greta Point to Cobham Drive Dec 2021 (2.7 MB pdf)Amended - Traffic resolution report
AMENDED Traffic Resolution (3.9 MB pdf)Stage 2: Greta Point to Cobham Drive 2021 consultation
Draft plans for consultation
Draft plans for the proposed designs between Greta Point and Cobham Drive. This document was amended following consultation.
Draft Supplementary Design Report: Greta Point to Cobham Drive for consultation
This report outlines the wide range of considerations and options explored when developing the proposed designs for stage 2. The report supplements the stage 1 reports. This document was amended following consultation.
Traffic resolution report for consultation
The traffic resolution (TR121-21) includes a legal description of the proposed changes. This document was amended following consultation.
Parking Management Plan for consultation
This report details the proposed parking changes between Greta Point and Cobham Drive. This document was amended following consultation.
Consultation report 2021
This is a summary of the feedback received during consultation on the concept design for the section of Evans Bay Parade between Cobham Drive and Greta Point (14 September to 14 October 2021).
Stage 1: Oriental Bay to Greta Point
Evans Bay plans - Weka Bay to Little Karaka Bay
These plans show the changes for the section between Weka Bay and Little Karaka Bay (work started in 2023).
Issues paper
The Council commissioned this report in 2016 to investigate improvement options for cycling along Evans Bay Parade from Cobham Drive to Oriental Bay.
Evans Bay section 1 plans
View the construction plans for the section between Oriental Parade (at the Carlton Gore Road intersection) and Greta Point.
Design report part 1
Evans Bay Design Report (part 1) - this provides information about the community working group process, options considered, and the multi-criteria assessment.
Design report part 2
Evans Bay Design Report (part 2) - this provides information about the community working group process, options considered, and the multi-criteria assessment.
Traffic Resolution: Section 1
This document describes in detail proposed changes to Evans Bay, between Carlton Gore Road and Greta Point.
Evans Bay concept designs
View concepts of both options at various places along Evans Bay.
Evans Bay Section 1 Traffic Resolution consultation
Evans Bay 2016 community engagement
See a summary of feedback from the first community engagement in 2016.